Most projects arrive as a photo of something close, with a list of what is wrong with it. That is enough to start. The first question is never “what do you want to make” — it is “how far from what already exists do you need to be”.

Development and sample work at the Baoyuanfeng factory
Development work stays with the team that will mould the part — not a separate design office.
Routes
3
Existing · part · new
DFM feedback
2–5days
From a drawing
Decorated sample
5–7days
After artwork
New tooling
25–35days
Drawing to trial
First sample, new product
30–40days
Including trial rounds

CHOOSE THE ROUTE

Three routes, three different commitments.

The route decides the cost, the minimum order and how long the project takes. Choosing the smallest route that solves the problem is usually the difference between a product that ships this season and one that does not.

01 · Customize an existing product

Take a model from the library and change what the buyer sees: colour, finish, print, laser mark, lid option, packing. No tooling, fastest route, 10 pieces on eligible configurations.

No tooling · 10 pcs, any print · 25–30 days

02 · Modify one component

Keep the body, change the part that makes it yours — a new lid, a different rim, an insert, a base. One small mould instead of a product's worth of tooling, and the body stays on an existing tool.

1 mould · from 1,000 pcs

03 · Develop a new product

A structure that does not exist yet: new body, new lid, new proportions. 2–4 mould sets, DFM review, trial rounds, then a production minimum of 3,000 pieces. Tooling is quoted as its own line.

2–4 moulds · 3,000 pcs

If your design can be delivered by route 01 or 02, we will say so — even when route 03 is the more profitable answer for us. A mould cut for a product that did not need one is a customer lost at the second order.

WHAT DRIVES COST AND TIME

Four things, and only one of them is the design fee.

Development cost is mostly tooling and trial time, not drawing time. This is what to expect before you approve a route.

FactorWhat it coversHow it moves the project
ToolingMould sets, cavity count, steel, slides, textureThe largest single line, and the one that sets the production MOQ
Product designWall sections, draft, gate position, tolerance stack-up, part countRedesigning a 2.5 mm wall to 2 mm can remove a mould set — or a whole part
SamplingTrial rounds, decorated samples, freight to you2–3 trial rounds are normal; each extra round adds roughly a week
TestingThird-party lab reports, food-contact migration, material identificationQuoted per model, and only where your market requires it

A development quotation separates these four. When they are folded into one number, nobody can tell whether the cost is in the steel or in the paperwork.

THE PROCESS

Six steps from brief to mass production.

Every step ends with something written down. The point is not bureaucracy — it is that a change after T1 costs tooling time, while the same change before T1 costs an email.

01

Brief and concept review

What the product has to do, who uses it, the market it sells into, the target quantity and price. Reference photos are welcome; a competitor sample is even better.

02

Route and DFM

We say which of the three routes fits, and what will be difficult in the drawing: thin sections, undercuts, threads, tolerance between lid and body.

03

Drawing or 3D model

We work from your file, or produce one from the brief. Rendered views and a dimensioned drawing come back for approval before any steel is cut.

04

Tooling and T1

The mould is cut, fitted and trialled. T1 parts are measured against the drawing, assembled and sent to you with the measurements.

05

Sample approval

T2 or T3 corrects what T1 showed. The approved sample — with artwork version and dimension sheet — becomes the standard for production.

06

Mass production

Production runs on the approved tool at the agreed MOQ, 25–30 days to ship, with first-off parts retained as the reference.

BEFORE THE FIRST CALL

What makes a development enquiry answerable.

None of these are gates. But an enquiry with all six gets a route recommendation and a cost shape in the first reply, instead of three emails of clarification.

01

The job the product does

Cold drink, hot drink, single serve, resale, giveaway. It decides wall thickness, material and lid type more than aesthetics do.

02

A reference

A product you like, a product you dislike, or your own sketch. Anything visual shortens the first exchange.

03

Volume and price target

First order and annual repeat, plus the unit price you need to hit. It tells us whether route 01 is even viable.

04

Material constraints

Food contact, recyclability, BPA-free, hot-fill, dishwasher — each one eliminates some options immediately.

05

Decoration intent

Print, laser, label, or bare. A part designed for a full wrap print is moulded differently from one that stays blank.

06

Market and documents

Destination country and the compliance documents your buyer will ask for, so testing is planned rather than discovered.

Can you develop a product from a photo only?

We can start from a photo, and we will tell you what cannot be inferred from it: internal dimensions, wall thickness, material and thread geometry. Those come from a sample, a drawing, or a first round of tooling with iteration.

Do you sign an NDA?

Yes, on request, before drawings are exchanged. Send yours or ask for ours.

Who owns the design?

You do, on a development project paid by you. We do not resell a customer's proprietary shape — and we say that in writing rather than in a sales conversation.

What if the product needs a component we do not make?

We say which parts are outside our process — metal bodies, glass, electronic modules — and quote them as sourced items with the source stated. We do not pass a sourced part off as our own moulding.

YOUR NEXT STEP

Send what you have. A sketch counts.

The job the product does, a reference, the volume and the price target. We reply with the route that fits and what it would take.