A faster route to your branded range.
Start with a cup or accessory, then review color, logo, decoration and packaging for your order.
- Model & quantity selection
- Artwork, color & packaging review
- Sample approval before production
OEM / ODM · SILICONE & PLASTIC MANUFACTURING
OEM & ODM silicone, Tritan and plastic drinkware for brands, businesses and promotional projects.
Tell us your use, quantity and arrival date. No model selected? Start with your idea.

MOQ, sampling speed and delivery depend on the model, customization, destination and approval status. New tooling is assessed separately. Confirm the schedule and its start date in your quotation.
TWO WAYS TO START
Choose an existing model or bring a drawing, sample or idea. We will review the right route with you.
Start with a cup or accessory, then review color, logo, decoration and packaging for your order.
Share your design, reference sample or intended use. Review feasibility, materials, tooling and sampling before committing to production.
PRODUCT PLATFORM





Product visuals are model references; final material, artwork and configuration are approved for your order.
CUSTOMIZATION, BUILT AROUND YOUR BRIEF
Match the decoration and components to the material, surface, use and budget.
01Silkscreen, pad print or full-wrap UV on a straight or tapered wall. A digital proof on your actual model comes back before anything is printed.
02A permanent mark cut into the surface, no ink to wear off. Best on solid hard plastic; not on soft silicone, and not across a seam.
03Base-lit, water-activated or switch. The module is chosen for the cup you pick, and we film the light before the run starts.
04Silicone, Tritan, PP and AS — matched to your Pantone number, not to a photograph of a swatch book.
05Heat transfer, water transfer, in-mould labels and pad print. We tell you which one actually holds on your shape.
06Gift box, kraft sleeve, printed insert, barcode and marketplace-ready labelling. Packed to arrive intact, not to look good in a photo.

INSIDE THE PLANT
Silicone and plastic processing by Shenzhen BYF Precision Mould Co., Ltd. The mould shop, the injection floor and final inspection sit in the same plant, so a change is a conversation across the yard — not a shipment.




01STEP 01 · YOUR SIDE
BUILT FOR BUSINESS BUYERS
Start from the line that sounds like your project. The three steps that follow are the same for every buyer.

Build or expand a branded range with model, material and packaging options.
Explore options →
Plan logo decoration, gift sets, distribution and required arrival dates.
Explore options →
Match drinkware and accessories to your service setting and intended use.
Explore options →02STEP 02 · HOW IT RUNS
FROM BRIEF TO DELIVERY

Product or idea, quantity, artwork and destination.

Agree materials, customization and any tooling.

Approve the specification, artwork and sample.

Follow the agreed acceptance and packing requirements.

Confirm shipping scope, destination and arrival plan.
03STEP 03 · HOW LONG
HOW LONG IT ACTUALLY TAKES
A single lead-time number hides where the wait sits. Here are the four stages separately, so your arrival date is built from parts you can check.




Stack the stages you actually need. A repeat order on an existing model is production plus transit. A new product is tooling, then production, then transit.
04STEP 04 · WHERE IT CAN STOP

QUALITY CONTROL
PAPER YOU CAN CHECK
A certificate proves a system exists. A test report proves a batch was checked. Both are on this site, unedited, at the size they were issued.






The full set of eleven scans is on the certificates page.
See all certificates →WHERE THEY GO
Start from the occasion, then check the models that suit it. Each page lists eight models with a reason.
BEFORE YOU REQUEST A QUOTE
Small-batch customization starts from 10 pieces on eligible configurations. Share the model, number of designs and packaging requirements; custom tooling and special specifications are reviewed separately.
Sampling can be as fast as one day for eligible projects. New molds, new structures and complex decoration require a separate assessment. Confirm sample type, artwork approval and timing in the quote.
The 7–10 days is transit only, counted from the day your goods are packed and handed to the carrier. Production is not included: a standard run takes 25–30 days ex-works, and new tooling takes 30–40 days end to end. Plan production and shipping as two separate blocks when you set a launch date.
Yes. Describe the intended use, approximate quantity and required arrival date. You can add a reference image or artwork on the existing enquiry form.
LET’S BUILD YOUR NEXT PRODUCT
Send your quantity, artwork, destination and arrival date. Start with the details you have; add files in the project enquiry.
No model selected? Describe your project in the requirements field.